MT. HERMON ROAD over SWIFT CREEK

1.70 FR 604 & 0.30 TO 671 · County 041, Virginia · Built 1972 · 2 Lanes · 388 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005243
Year Built
1972
Reconstructed
2016
Length
14.2 m (46.6 ft)
Max Span
13.4 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
388
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$175,000,000
Total Project Cost
$242,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.