INTERSTATE-295 SBL over ROUTE 10

2.74 Fr CL & 1.30 To 746 · County 041, Virginia · Built 1987 · 4 Lanes · 17,738 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000005210
Year Built
1987
Length
73.9 m (242.5 ft)
Max Span
36.9 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
17,738
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.