I-95 NB RAMP B over I-95

.35Fr95NBL&.29To150WBL · County 041, Virginia · Built 1978 · 1 Lanes · 7,358 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005094
Year Built
1978
Length
77.1 m (253 ft)
Max Span
41.6 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
7,358
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$50,000,000
Total Project Cost
$56,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.