I-95 over RTE 608 (REYMET RD)

1.21 Fr 288 & .72 To 613 · County 041, Virginia · Built 1958 · 5 Lanes · 108,808 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000005058
Year Built
1958
Length
23.8 m (78.1 ft)
Max Span
21.9 m
Width
37.4 m (122.7 ft)
Lanes
5
Daily Traffic
108,808
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000,000
Total Project Cost
$215,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.