ROUTE I-85 NBL over N&S RAILWAY (ABANDONED)

2.05 RTE.1 4.08 RTE.630 · County 025, Virginia · Built 1969 · 2 Lanes · 12,288 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000003628
Year Built
1969
Reconstructed
2013
Length
49.1 m (161.1 ft)
Max Span
15.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
12,288
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$189,600,000
Total Project Cost
$285,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.