I-85 SBL over MEHERRIN RIVER

.56 FR MECKL 4.47 TO 644 · County 025, Virginia · Built 1969 · 2 Lanes · 12,043 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000003623
Year Built
1969
Length
125 m (410.1 ft)
Max Span
24.3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
12,043
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$187,500,000
Total Project Cost
$198,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.