NarrowPassageRd/43 over Branch of James River

1.20-Rte688N; 0.26-Rte729 · County 023, Virginia · Built 1986 · 2 Lanes · 684 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000003195
Year Built
1986
Length
6.3 m (20.7 ft)
Max Span
3 m
Lanes
2
Daily Traffic
684
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$288,000,000
Total Project Cost
$994,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.