I-77 SBL RAMP A over CLEAR FORK CREEK

16.31-WCL; 0.05-Rt.61 · County 021, Virginia · Built 1974 · 2 Lanes · 357 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000003023
Year Built
1974
Reconstructed
2022
Length
92.7 m (304.1 ft)
Max Span
27.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
357
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$600,000,000
Total Project Cost
$819,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.