I-77 SBL over RTE 717

.94 FR WCL-.36 TO BWMT · County 021, Virginia · Built 1972 · 3 Lanes · 13,622 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000002986
Year Built
1972
Reconstructed
1987
Length
44.2 m (145 ft)
Max Span
18.3 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
13,622
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000,000
Total Project Cost
$217,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.