W.Ly.Sal.Tk 221SBL over North Fork Goose Creek

8.36-WCL BED;6.26-BOT CO · County 019, Virginia · Built 1928 · 2 Lanes · 7,294 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000002619
Year Built
1928
Reconstructed
1957
Length
34.3 m (112.5 ft)
Max Span
11 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
7,294
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000,000
Total Project Cost
$696,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.