SBL ROUTE 0081 over RAMP 1

0.75 TO 250 & 1.19 TO 262 · County 015, Virginia · Built 1969 · 2 Lanes · 30,851 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001791
Year Built
1969
Length
63.7 m (209 ft)
Max Span
20.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
30,851
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$440,000,000
Total Project Cost
$600,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.