I-81 NBL over STOVER SCHOOL RD (662)

6.08 RCKBR CO- 1.58 RT 11 · County 015, Virginia · Built 1966 · 2 Lanes · 24,438 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001763
Year Built
1966
Length
37.7 m (123.7 ft)
Max Span
14.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
24,438
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$42,000,000
Total Project Cost
$44,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.