COVE GARDEN ROAD over NORFOLK SOUTHERN RAILWAY

0.25 FR 29 / 4.25 TO 712 · County 003, Virginia · Built 1997 · 1 Lanes · 214 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000686
Year Built
1997
Length
32.9 m (107.9 ft)
Max Span
14 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
214
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$210,000,000
Total Project Cost
$260,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.