RICHMOND ROAD over BUCKINGHAM BRANCH RR

0.10 FR 22 / 0.10 TO 729 · County 003, Virginia · Built 1939 · 2 Lanes · 5,212 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000000595
Year Built
1939
Reconstructed
2012
Length
54.9 m (180.1 ft)
Max Span
21.6 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
5,212
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$290,000,000
Total Project Cost
$325,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.