STONY POINT ROAD over STREAM

2.10 FR 640 / 1.17 TO 641 · County 003, Virginia · Built 1958 · 2 Lanes · 2,273 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000000000422
Year Built
1958
Length
8.5 m (27.9 ft)
Max Span
1.7 m
Lanes
2
Daily Traffic
2,273
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000,000
Total Project Cost
$155,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.