GEORGE MASON DRIVE over ARLINGTON BOULEVARD

0.80 244/0.20 PERSHING DR · County 013, Virginia · Built 1977 · 6 Lanes · 16,630 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000000033
Year Built
1977
Length
34.7 m (113.8 ft)
Max Span
34.7 m
Width
27.7 m (90.9 ft)
Lanes
6
Daily Traffic
16,630
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$65,000,000
Total Project Cost
$175,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.