US 00BR4 BUS. over CLARENDON RIVER

0.5 MI W JCT. VT.3 · County 021, Vermont · Built 1959 · 4 Lanes · 12,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
203200B4-311202
Year Built
1959
Length
35.4 m (116.1 ft)
Max Span
33.5 m
Width
20.8 m (68.2 ft)
Lanes
4
Daily Traffic
12,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,773,000
Total Project Cost
$2,823,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.