TR 5 FAS 236 over WEST BRANCH LITTLE RIVER

0.35 MI TO JCT W VT108 · County 015, Vermont · Built 1952 · 2 Lanes · 5,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
200236005308082
Year Built
1952
Reconstructed
1982
Length
19.5 m (64 ft)
Max Span
18.9 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
5,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$567,000
Total Project Cost
$617,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.