VT 00108 ML over BREWSTER RIVER

5.0 MI S JCT. VT.15 · County 015, Vermont · Built 1958 · 2 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
200235001708022
Year Built
1958
Length
24.1 m (79.1 ft)
Max Span
23.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$968,000
Total Project Cost
$1,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.