TR 04 FAS 211 over HUNTINGTON RIVER

0.1 MI N JCT. VT.17 · County 001, Vermont · Built 1962 · 2 Lanes · 420 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
200211007S01192
Year Built
1962
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
420
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$252,000
Total Project Cost
$302,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.