TR 03 FAS 156 over NORTH FORK CREEK

2.0 MI W JCT VT 22A · County 001, Vermont · Built 1946 · 2 Lanes · 310 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
200156000401142
Year Built
1946
Reconstructed
2017
Length
22.6 m (74.1 ft)
Max Span
21.9 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
310
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$648,000
Total Project Cost
$698,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.