US 00005 ML over SALMON BROOK

3.5 MI N JCT. VT.9 E · County 025, Vermont · Built 1939 · 2 Lanes · 3,100 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
200113001113052
Year Built
1939
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Lanes
2
Daily Traffic
3,100
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$363,000
Total Project Cost
$413,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.