VT 00279 ML over VT279 OVER FURNACE BRK

1.0 MI E JCT. US 7 · County 003, Vermont · Built 2010 · 4 Lanes · 3,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
200110001202022
Year Built
2010
Length
144.8 m (475.1 ft)
Max Span
71.3 m
Width
16.2 m (53.1 ft)
Lanes
4
Daily Traffic
3,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,844,000
Total Project Cost
$8,895,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.