I 00091 ML over I 91 OVER TH NO 22
2.8 MI N EXIT 6 · County 025, Vermont · Built 1965 · 4 Lanes · 15,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.217264, -72.454153
This bridge is in worse condition than 21.6% of bridges in County 025. The average bridge in Vermont is 0 years old; this one is 61 years old.
Nearby Bridges
I 00091 ML over I 91 OVER TH NO 20
Built 1965
NH 12 over NECRR
Built 1959
BRIDGE STREET over NECRR
Built 1992
NH 12A over NH 12 NECRR
Built 1970
C3006 over WILLIAMS RIVER
Built 1977
I 00091 ML over I 91 OVER GM RR WLMSR
Built 2019
US 00005 ML over WILLIAMS RIVER
Built 1929
I 00091 ML over I 91 OVER GM RR WLMSR
Built 2021
US 00005 ML over US 5 OVER GREEN MT RR
Built 1929
NH 11 over NECRR
Built 1965
Bridge Details
- Structure #
- 20009124-213142
- Year Built
- 1965
- Length
- 6.4 m (21 ft)
- Max Span
- 6.4 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 4
- Daily Traffic
- 15,000
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $279,000
- Total Project Cost
- $329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.