I 00091 ML over I91 OVERTH77/PR/CRL R.R.
0.2 MI S EXIT 20 · County 005, Vermont · Built 1978 · 3 Lanes · 10,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.401083, -72.020419
This bridge is in worse condition than 44% of bridges in County 005. The average bridge in Vermont is 0 years old; this one is 48 years old.
Nearby Bridges
I 00091 ML over I 91 OVER TH77/PR /CRLRR
Built 1978
I 00091 ML over I 91 OVER US 5
Built 1978
I 00091 ML over I 91 OVER US 5
Built 1978
I 00091 SB ML over I 91SB OVER RAMP D
Built 1978
I 00091 RAMP B over RAMP B OVER I91N&S
Built 1982
I 00091 NB ML over I 91NB OVER RAMP D
Built 1978
US 00005 ML over SLEEPERS RIVER
Built 1975
US 00005 ML over US 5 OVER LVRR
Built 1976
C3371 over SLEEPERS RIVER
Built 2017
C3070 over SLEEPERS RIVER
Built 1975
Bridge Details
- Structure #
- 200091082S03112
- Year Built
- 1978
- Length
- 181.1 m (594.2 ft)
- Max Span
- 75.6 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 3
- Daily Traffic
- 10,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,709,000
- Total Project Cost
- $9,759,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.