I 00091 ML over BLACK RIVER

0.4 MI S EXIT 7 · County 027, Vermont · Built 1965 · 2 Lanes · 15,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
200091026S14182
Year Built
1965
Length
96.3 m (315.9 ft)
Max Span
39.6 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
15,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,893,000
Total Project Cost
$3,943,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.