I 00091 ML over I 91 OVER VT 103

I 91 EXIT 6 · County 025, Vermont · Built 1963 · 3 Lanes · 15,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
200091023S13142
Year Built
1963
Length
47.9 m (157.2 ft)
Max Span
17.4 m
Width
14.4 m (47.2 ft)
Lanes
3
Daily Traffic
15,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,594,000
Total Project Cost
$2,644,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.