I 00091 ML over I 91 OVER WSTMSTER SH
I 91 EXIT 5 · County 025, Vermont · Built 1963 · 2 Lanes · 11,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.091122, -72.456139
This bridge is in worse condition than 79.3% of bridges in County 025. The average bridge in Vermont is 0 years old; this one is 63 years old.
Nearby Bridges
I 00091 ML over I 91 OVER WSTMSTER SH
Built 1963
C3058 over MORSE BROOK
Built 1953
NH123 over CONNECTICUT RIVER
Built 1910
NH123 over CONNECTICUT RIVER
Built 1910
C3025 over SAXTONS RIVER
Built 1975
TR 00TH4 over TH NO 4 OVER I 91
Built 1963
TR 01 FAS 126 over SAXTONS RIVER
Built 1940
I 00091 ML over I 91 OVER TH 1 SAXTON
Built 1963
I 00091 ML over I 91 OVER TH 1 SAXTON
Built 1963
NH 12 NH123 over COLD RIVER
Built 1960
Bridge Details
- Structure #
- 200091020S13202
- Year Built
- 1963
- Length
- 49.7 m (163.1 ft)
- Max Span
- 18.3 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 11,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,997,000
- Total Project Cost
- $2,047,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.