I 00091 ML over I 91 OVER TH NO 3

1.5 MI N EXIT 4 · County 025, Vermont · Built 1961 · 2 Lanes · 11,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
200091015S13132
Year Built
1961
Length
47.5 m (155.8 ft)
Max Span
19.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
11,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,911,000
Total Project Cost
$1,961,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.