VT 00105 ML over MUD CREEK

3.0 MI W JCT. VT.100 · County 019, Vermont · Built 1961 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
200034005910162
Year Built
1961
Length
10.1 m (33.1 ft)
Max Span
8.8 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$439,000
Total Project Cost
$489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.