VT 0104A ALT over ARROW HEAD LAKE
1.1 MI E JCT. U.S.7 · County 011, Vermont · Built 2020 · 2 Lanes · 3,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.680644, -73.084372
This bridge is in worse condition than 6.7% of bridges in County 011. The average bridge in Vermont is 0 years old; this one is 6 years old.
Nearby Bridges
C2001 over LAMOILLE RIVER
Built 1986
US 00007 ML over I 89 UNDER US 7
Built 1968
I 00089 ML over I 89 OVER NECRR
Built 1967
I 00089 ML over I 89 OVER NECRR
Built 1967
I 00089 ML over I 89 OVER TH NO 6
Built 1967
I 00089 ML over I 89 OVER TH NO 6
Built 1967
I 00089 ML over I 89 OVER TH NO 12
Built 1967
TR 00TH3 over TH NO 3 OVER I 89
Built 1967
US 00007 ML over LAMOILLE RIVER
Built 1998
C3033 over BROWNS RIVER
Built 1988
Bridge Details
- Structure #
- 200023000106082
- Year Built
- 2020
- Length
- 28.7 m (94.2 ft)
- Max Span
- 27.4 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 3,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,030,000
- Total Project Cost
- $1,080,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.