US 00004 ML over US 4 OVER VT 30
US 4 EXIT 4 VT 30 · County 021, Vermont · Built 1971 · 2 Lanes · 9,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.617139, -73.206497
This bridge is in worse condition than 85.3% of bridges in County 021. The average bridge in Vermont is 0 years old; this one is 55 years old.
Nearby Bridges
US 00004 ML over US 4 OVER VT 30
Built 1971
TR 0TH24 over TH NO 24 OVER US 4
Built 1971
TR 0TH24 over TH NO 24 OVER US 4
Built 1971
VT 0004A ALT over CASTLETON RIVER
Built 1962
VT 00030 ML over CLARENDON PITTSFORD R.R.
Built 2015
VT 00030 ML over CASTLETON RIVER
Built 1938
TR 00TH5 over TH NO 5 OVER US 4
Built 1971
C3005 over CASTLETON RIVER
Built 1908
C2005 over CASTLETON RIVER
Built 1968
US 00004 ML over LAKE BOMOSEEN TH 2
Built 1971
Bridge Details
- Structure #
- 200020010W11032
- Year Built
- 1971
- Length
- 71 m (232.9 ft)
- Max Span
- 45.7 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 9,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,344,000
- Total Project Cost
- $3,394,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.