NH 9 over CONNECTICUT RIVER

RT9 NH/VT BORDER · County 025, Vermont · Built 2003 · 2 Lanes · 9,969 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
200010B05613022
Year Built
2003
Length
136.2 m (446.9 ft)
Max Span
130 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
9,969
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,718,000
Total Project Cost
$3,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.