WATER STREET over CASTLETON RIVER

0.2 MI TO JCT W CL3 TH6 · County 021, Vermont · Built 1992 · 1 Lanes · 60 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
103408001311282
Year Built
1992
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
5.4 m (17.7 ft)
Lanes
1
Daily Traffic
60
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$172,000
Total Project Cost
$223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.