C3010 over CURTIS HOLLOW BROOK

0.4 MI JCT TH 10 + RT 4 · County 027, Vermont · Built 1928 · 1 Lanes · 25 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
101424001014241
Year Built
1928
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
25
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$265,000
Total Project Cost
$415,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.