C3038 over N. BR. BLACK RIVER

0.03 MI TO JCT W CL2 TH1 · County 027, Vermont · Built 2011 · 1 Lanes · 10 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

43.468608, -72.570347

This bridge is in worse condition than 6.8% of bridges in County 027. The average bridge in Vermont is 0 years old; this one is 15 years old.

Nearby Bridges

Bridge Details

Structure #
101414002714141
Year Built
2011
Reconstructed
2024
Length
21.9 m (71.9 ft)
Max Span
20.7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$403,000
Total Project Cost
$453,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.