C3011 over BROOK

0.06 MI TO JCT W/ TH 5 · County 027, Vermont · Built 2012 · 1 Lanes · 15 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
101405004414051
Year Built
2012
Length
12.2 m (40 ft)
Max Span
11.6 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
15
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$371,000
Total Project Cost
$521,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.