C2003 over N BR DEERFIELD RIVER

0.1 MI E JCT VT 100 · County 025, Vermont · Built 1939 · 2 Lanes · 1,148 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
101322001613221
Year Built
1939
Reconstructed
1980
Length
39.3 m (128.9 ft)
Max Span
19.2 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
1,148
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,156,000
Total Project Cost
$1,206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.