C2001 over MARLBORO POND BROOK

0.45 MI TO JCT W C3 TH14 · County 025, Vermont · Built 1950 · 2 Lanes · 220 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
101308001413081
Year Built
1950
Length
6.1 m (20 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
220
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$182,000
Total Project Cost
$232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.