C3052 over AMES HILL BROOK

0.03 MI TO JCT W CL2 TH6 · County 025, Vermont · Built 1991 · 2 Lanes · 650 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
101302002413021
Year Built
1991
Length
7.6 m (24.9 ft)
Max Span
6.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
650
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$210,000
Total Project Cost
$260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.