C3011 over BULL RUN BROOK

0.01 MI TO JCT W C3 TH14 · County 023, Vermont · Built 1974 · 1 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
101215004912151
Year Built
1974
Length
7.9 m (25.9 ft)
Max Span
6.7 m
Width
4.4 m (14.4 ft)
Lanes
1
Daily Traffic
20
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$131,000
Total Project Cost
$181,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.