C2011 over EAST CREEK

0.08 MI TO JCT W US7 · County 021, Vermont · Built 1950 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
101120000911201
Year Built
1950
Reconstructed
2010
Length
30.2 m (99.1 ft)
Max Span
29.6 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$901,000
Total Project Cost
$951,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.