C3023 over EAST CREEK

2.25 MI TO JCT W CL2 TH1 · County 021, Vermont · Built 2019 · 1 Lanes · 10 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
101104002211041
Year Built
2019
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
1
Daily Traffic
10
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.