C3CLY over CLYDE RIVER

0.35 MI TO JCT W CL2 TH8 · County 019, Vermont · Built 1956 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
101015000710151
Year Built
1956
Reconstructed
1991
Length
21 m (68.9 ft)
Max Span
20.4 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$531,000
Total Project Cost
$581,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.