C3015 over BURGESS BRANCH

0.15 MI TO JCT W CL2 TH3 · County 019, Vermont · Built 2020 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
101013001610131
Year Built
2020
Length
31.4 m (103 ft)
Max Span
30.8 m
Width
6.4 m (21 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$523,000
Total Project Cost
$673,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.