C3034 over BLACK RIVER

0.01 MI TO JCT W CL3 TH5 · County 019, Vermont · Built 1952 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
101011002110111
Year Built
1952
Length
22.3 m (73.2 ft)
Max Span
21 m
Width
4.1 m (13.5 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$426,000
Total Project Cost
$576,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.