C3039 over MUD BROOK

0.3 MI TO JCT W CL2 TH1 · County 019, Vermont · Built 1940 · 2 Lanes · 250 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
101004001910041
Year Built
1940
Reconstructed
1969
Length
10.4 m (34.1 ft)
Max Span
9.4 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$290,000
Total Project Cost
$340,000