C2002 over ROARING BROOK

0.05 MI TO JCT W C3 TH43 · County 019, Vermont · Built 2015 · 2 Lanes · 920 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
101002000810021
Year Built
2015
Length
14.6 m (47.9 ft)
Max Span
13.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
920
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.