C3064 over TABOR BR.WAITS RIVER

0.1 MI JCT TH 64 + TH 1 · County 017, Vermont · Built 1920 · 1 Lanes · 40 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
100912002609121
Year Built
1920
Reconstructed
2010
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
40
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$185,000
Total Project Cost
$235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.