C3008 over W. BR. OMPOMP R. OVFLOW

0.05 MI TO JCT W C3 TH39 · County 017, Vermont · Built 1992 · 1 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
100911002509111
Year Built
1992
Length
12.8 m (42 ft)
Max Span
12.5 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
10
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$209,000
Total Project Cost
$259,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.